A two-year project on a new innovation campus saw Orbital install systems for distribution of process gases over six levels, along with supply, installation and commissioning of hazardous gas cabinets.
- Collaboration with Bouygues and CMB Engineering
- £300m innovation campus project
- Project value £5.1 million completed over two years
- Distribution of Inert, toxic, flammable and pyrophoric gases over 6 levels
- Supply, installation and commissioning of hazardous gas cabinets
- Orbital welding of tube sizes ¼” OD to 3” OD
- Orbital designed and manufactured point of use hardware
- 4 – 20 operatives on site, dependent on programme stage
- Over 6,000m of tubing installed